Skip to content
Brenwick Conservation

River bank, sample campaign

Halden Creek willow banks

Place
Halden Creek, north bank
Habitat
River bank
Period
Sep 2024 to Aug 2027
Funding
61% of goal

Live willow cuttings and coir rolls to hold a bank that lost two metres in one winter.

Sample campaign for this template

Chapter 01, the problem Fixed point A, bank top

A bank that lost two metres in one winter

Two winter floods took the bank back to bare clay. The field above lost its fence line, and the creek carried the soil down to the spawning gravels.

Plate 01 North bank after the March flood Sample photo

2.0m

of bank lost between the October and March surveys

Fig. 01.1 Bank edge to survey peg, measured each season Sample figure

Chapter 02, the plan Work order, three seasons

What we plant and what we walk

Four jobs over three seasons, each one signed off by the crew lead before the next starts.

Plate 02 Step 01 of 04 Sample photo
  1. 01

    Cut live willow from the upper reach

    Rods are cut in the dormant season from trees we coppice upstream, so the stock is local.

    Season 1, November

  2. 02

    Stake coir rolls along 180 m of bank

    The rolls take the force of the water while the roots are still short.

    Season 1, December

  3. 03

    Plant 2,400 cuttings behind the rolls

    Volunteer crews push each cutting two thirds into the clay, a hand's width apart.

    Season 1, February

  4. 04

    Walk the twelve survey points each season

    The same points, the same photo angles, written up on this page whether cover went up or not.

    Seasons 1 to 3

03What we measured

01 51.5120° N, 3.2410° W

The same square of bank, every month

We photograph one square of bank from the same peg each month, then count cover by hand.

Halden Creek, north bank Willow cuttings took on the north bank 18% → 46% Bank cover, observed 14 Sep Sample data All three field sites

Chapter 04, where it stands Fixed point A, read each season

Most of the way to the cover we planned

Four readings so far at the same peg. The target is the cover a stable bank of this height needs.

Autumn 2025

46%

bank cover at fixed point A

    Fig. 04.1 Season rail, target 60% cover Sample data
    Plate 04 Fixed point A, latest reading Sample photo

    Next surveySat 14 Mar, all twelve points

    Funding, sample figures Read from the campaign ledger

    $18,400

    raised of a $30,000 goal

    61% funded, Sample figure, as of 1 Nov

    Crew days Boots and gloves provided

    Next crew days at this site

    Weekday mornings with a crew of about ten. No experience needed.

    1. Tue 18 NovStaking coir rolls on the lower bendMeet 9:00 at the field gate
    2. Thu 4 DecCutting willow rods upstreamMeet 9:00 at the mill bridge
    3. Wed 11 FebPlanting day, north bankMeet 8:30 at the field gate

    How crew days work

    Your gift buys cuttings, stakes and the survey kit for the next season on this bank.

    Support this campaign All campaigns